Skip to main content

Table 1 Predetermined parameters by the pilot plant and size of data samples

From: Application of a three-dimensional fiber lay-down model to non-woven production processes

 

Predetermined

FIDYST

IPD

v belt [m/s]

v spin [m/s]

f diam [m]

t [m]

# points

# points

Sample I

0.633

79.400

1210−6

0.001

13×19,850

4,352,392

Sample II

4.167

79.400

1210−6

0.001

13×17,850

500,583