Skip to main content

Table 3 Fixed and variable costs used in this instance

From: A model for the location and scheduling of the operation of second-generation ethanol biorefineries

 

Fixed cost

Variable costs

Bio

\(t_{1}\)

\(t_{2}\)

\(t_{3}\)

\(t_{1}\)

\(t_{2}\)

\(t_{3}\)

1

4500

3900

5200

0.51

0.51

0.56

2

4500

3950

5200

0.52

0.52

0.54

3

4510

3905

5200

0.51

0.51

0.55

4

4560

4200

5600

0.50

0.50

0.54

5

6160

7100

8700

0.49

0.350

0.54