Skip to main content
Figure 5 | Journal of Mathematics in Industry

Figure 5

From: Simulation and multi-objective optimization to improve the final shape and process efficiency of a laser-based material accumulation process

Figure 5

Solidification and estimated molten length l (Run 12): 3d geometry at time instant \(t_{\mathrm{ max}}=t_{106}={39.0}\) ms with maximal melt volume (left) and perpendicular cross sections of the final geometry at \(t_{667}={246}\) ms showing the solidification by isolines for \(T_{m}\) at \(t_{\{106+k\cdot100\}}={39.0}~\text{ms}+k\cdot {36.8}~\text{ms}\) with \(k\in\{0,1,\ldots,5\}\) (middle, right)

Back to article page