Figure 3From: Determining cost-efficient controls of electrical energy storages using dynamic programmingComparison of the run-time for the DP and the MILP. The run-time is measured in seconds for different time periods. We observe a linearly and exponentially increasing run-time for the DP and MILP, respectivelyBack to article page